Activities
"BatysMunayStroy" Construction company LLP profession history
Since 2008, LLP «BatysMunaiStroy Service Company» has established itself as a professional in the field of high-quality construction and installation works in various fields of activity.
2019 - 2020
2019 - 2020
Transformation Stage
- Completion of the repair of the production base in the city of Aksai and the relocation of personnel;
- Active and comprehensive work to improve health, safety and environmental protection indicators and road safety;
- Construction of a camp for 510 people;
- Transfer and construction of access roads to environmental monitoring stations # 10, 13, 16, 11, 6 and 12.
2017 - 2018
2017 - 2018
Development stage
- "Service Company" BatysMunayStroy "LLP implemented the project" UPKG-2. Anti-terrorism system. Fencing » KNGKM.
- The company implemented the project "CPC. Anti-terrorism system. Fencing »KNGKM.
- Arrangement of a temporary site for the overhaul of wells 430 and 9864.
- Contracts won with Karachaganak Petroleum Operating B.V.
AP / D / 18/0839 - Provision of services for the relocation of environmental monitoring stations;
AP / D / 18/0516 - Provision of maintenance services for office buildings and office space in the field;
- Setting up an EMS transfer system. Implementation of the transfer of EMS No. 10 and No. 13;
Setting up a system for the maintenance of KPO facilities at the field.
2016
2016
Company reconstruction
- In 2016, BatysMunaiStroy Service Company LLP completed an order for RFQ-0089. , 9852, 9854, 9847, dismantling after drilling a well. 9855 KNGKM;
- This year, the company began the phased implementation of system restructuring programs of BatysMunaiStroy Service Company LLP based on the training approach developed in the period 2015-2016, under the guidance of a consultant on organizational development and management of ke. n Pavlutsky A.V.;
- The company acquired a production base with full infrastructure in the city of Aksai, with a total area of 35,826 sq.m .;
- The company launches an accredited laboratory for testing such materials as: asphalt concrete, concrete, inert materials and soil;
- The warmed Concrete Mixing Plant ELKOMIX-35 Quick Master was put into operation in the production base of Berezovsky s / o, with a capacity of 35 m3 / h, with rooms for storing inert materials.
2013 - 2015
2013 - 2015
Stage of increase in volumes and mobilization
- 2013 was concentrated on high-quality construction of temporary sites for drilling wells and construction of emergency roads to wells 9842 (E03 A7) and 9839 (N03A), as well as patching of the Aksay-Orenburg road (15 km);
- The company completed the construction of its own industrial base in Berezovsky s / o Burlinsky district of the West Kazakhstan region, with a total area of 14 415 sq.m., which includes office premises, an administrative and household complex, dining rooms, warehouses for storing materials, equipped boxes for specialized construction equipment , reinforcing, carpentry and turning shops;
- BatysMunaiStroy Service Company LLP acquired 11 freight transport items, 6 buses, 9 cars, 2 truck cranes and 12 specialized equipment items;
- In 2013, the company successfully executed a contract with KPO for the supply of domestic plates, as well as SHELL oils in KPO;
- Conclusion of the Contract AR / D / 14/0962 for the provision of civil engineering services;
- In 2015, the Company completed the construction and repair of the Burlin-Aksai-Zhampity road section (15 km) using modern equipment such as the Wirtgen WR 2500 recycler, the Wirtgen WM 1000 unit and the Wirtgen road mill.
2012
2012
Stage of customer base diversification
«BatysMunayStroy» Service Company» LLP acted as the main contractor of «Montazhspetsstroy» JSC in the construction of the shift camp of «Zhaikmunai» LLP for 460 people at the Chinarev oil and gas condensate field and the main supplier of summer diesel fuel.
The company supplied diesel fuel for 5 drilling rigs at the Alibekmola field of the Aktobe region for the drilling company «Sun Drilling» LLP.
2011
2011
Stage of improving the quality of services
In 2011, the company began to fully implement the quality management, ecology and occupational safety and health systems in the production of construction and installation works, as well as HSE systems, the achievement of which was the faultless performance of the construction of the access road and the temporary site to the well NW04 KOGCF.
2008 - 2010
2008 - 2010
Stage of formation
-Conclusion of the contract AP/D/08/3138 for the provision of civil construction services;
-Execution of the first orders for the construction of temporary drilling sites, completion of wells 16, 9817, 917 and construction of access roads to well 5291 KOGCF.
2020