Our projects
The volume of work performed on the Karachaganak project
in the period of 2008 - 2020:
- Transfer and construction of access roads to environmental monitoring stations # 10, 13, 16, 11, 6 and 12.
- Temporary site for overhaul of wells 430, 9864, 9868;
- Project "CCP Anti-Terrorism Protection System. Fencing ";
- Repair of connecting road No. 19;
- Project "Anti-Terrorism Protection System UKPG-2. Fencing ";
- Earthwork for laying loops to the ICS. 9852, 9854, 9847;
- Temporary site for overhaul of wells at well 627;
- Average repair of a regional road Aksai - Burlin (14 km);
- Patching the road of the Orenburg-Aksay highway (13 km);
- Turnkey construction of 3500 m2 storage facilities;
- Construction of access roads to EMS 15 and 18 on the border of the sanitary protection zone of the field;
- Crossing the Kolminkovo River to lay the GOR pipeline plume;
- Construction of access road and temporary site to the well. NW04;
- Improvement of paving and roads of well sites 912, 430;
- Repair of access roads to well 911, 9820;
- Temporary site for well overhaul at well 9813;
- Dismantling of slabs, removal of oil-contaminated sand from the well site after the borehole from well 809;
- Temporary pond storage of technical water for drilling and construction of an access road to well 9816 D;
- Temporary section for well overhaul at well RP6;
- Temporary site for well overhaul at well 917;
- Arrangement of a site around well 9817;
- Temporary section for the overhaul of the well in the well 16;
- Temporary section for drilling and construction of access road to well 5291
- Temporary ponds storage of industrial water for drilling and construction of access road to well 9816;
Installation of metalstructures
Completion of drilling sites
Crossing the Kolminkovo River to lay the GOR pipeline plume
Scaffolding works
Manual excavation of soil (ground disclosure for inspection)
Repair of the Aksay - Burlin road in 2015
Projects «Unit – 2 Anti-Terrorism System. Fence»in 2017 and «KPC Anti-Terrorism System. Fence»in 2018
Transfer of environmental monitoring stations2018 – 2020
Construction of a shift camp in the Aksai city in 2019-2020
All works are carried out with the obligatory provision of safe, healthy working and living conditions for the personnel involved in production and management activities. The company is certified for compliance with international standards ISO 9001, ISO 14001, OHSAS 18001 and has valid certificates.